Multi Processor
Configure your own Supermicro server based on your needs. If you need help configuring your server, do not hesitate to contact our sales referent: +1 (757) 909-6188
View filters
72 products:
Products in category
ASUS ESC8000A-E12-SKU2/10G/3kW(2+2)/2 PCIe ...
AMD EPYC 9004 dual-processor 4U GPU server that supports eight dual-slot GPUs, liquid cooling solution, up to 24 DIMM, 11 PCIe 5.0 slots, Dual NVMe, four 3000W Titanium power supplies, OCP 3.0 and ASMB11-iKVM
$ 12,016.26
On demand
Stock allocation and delivery options
Delivery to selected address
Thursday 14. 8. at the latest Thursday 6. 11.
Thursday 14. 8. at the latest Thursday 6. 11.
ASUS ESC8000A-E12P-SKU5/10G/3kW(2+2)/4PCIe ...
AMD EPYC 9004 dual-processor 4U GPU server that supports eight dual-slot GPUs, PCIe 5.0 Switch Solution, liquid cooling solution, up to 24 DIMM, 13 PCIe 5.0 slots, eight NVMe, four 3000W Titanium power supplies, OCP 3.0 and ASMB11-iKVM
$ 21,069.35
On demand
Stock allocation and delivery options
Delivery to selected address
Thursday 14. 8. at the latest Thursday 6. 11.
Thursday 14. 8. at the latest Thursday 6. 11.
ASUS ESC4000-E10S-SKU1/2200W(1+1) / 2NVMe ...
2U GPU server powered by dual-socket 3rd Gen Intel Xeon Scalable processors that supports up to 16 DIMM, four dual-slot GPU, 2 M.2, four NVMe (by SKU), total eleven PCIe 4.0 slots, one OCP 3.0 (by SKU) and ASUS ASMB10-iKVM.
$ 6,027.02
On demand
Stock allocation and delivery options
Delivery to selected address
Thursday 14. 8. at the latest Thursday 6. 11.
Thursday 14. 8. at the latest Thursday 6. 11.
ASUS RS720-E10-RS12/10G/1.6KW/8NVME/OCP - ...
Powered by dual-socket 3rd Gen Intel Scalable processors, 32 DIMMs and support for a maximum TDP of up to 270 W per socket
Up to four all-flash NVMe, four NVMe/SATA/SAS and four SATA/SAS drives on front panel, plus 2 optional NVMe in rear panel
High power efficiency with redundant 2400W/1600W 80 Plus® Platinum power supplies
$ 4,512.13
On demand
Stock allocation and delivery options
Delivery to selected address
Thursday 14. 8. at the latest Thursday 6. 11.
Thursday 14. 8. at the latest Thursday 6. 11.